top of page
GALLERY
Lagged and clad plant room | Lagged and clad plant room. |
---|---|
lager working on a segment bend. | Boiler heating hot water pump sets. |
Lager working under gridmesh. | lagged and clad pipe |
Lagged and clad chilled water header. | lagged and clad plant. |
clad domestic hot water pipe work. | Lagged and clad pipe work on the roof area. |
Fire penetration with a twist. | Lagged and clad pump sets. |
Lagged and clad pipe. | Domestic hot water insulation. |
Lagged and clad hot water pipe. | Lagged and clad domestic hot water pipe. |
Duct Fyrewrap | Lagged and clad plant room. |
Lagged and clad units. | Lagged pipework. |
Lagged pipework | Colourbond cladding |
Cladding | Sheet metal worker installing some cladding. |
Lagged ready for cladding | Lagged ready for cladding |
Lagged and clad unit. | Lagged pipework. |
Duct Fyrewrap | |
Boilers lagged and cladded. | Lagged pipe ready for cladding. |
Lagged unit. | Lagged units. |
Heating hot water lagging and cladding. | Heating hot water pump sets. |
Heating hot water pump sets lagged and cladded. | Chilled water cladding |
Hot water pipe cladding. | |
Lagging | Lagged plant room |
lagged plant room. | Lagged plant room. |
Lagged plant room | Chilled water tank Lagged and cladded |
Chilled water pump retrofit. | Chilled water tank and pipe work. |
Lagging and cladding to plant room for a new pump. | Retro fit |
New pipe work for new buffer tank. | New cladding. |
8kg sound lag to new unit. | Soundlag to new unit |
New lagging and cladding to AHU units | Lagging and cladding to new AHU unit |
New lagging and cladding to AHU units. | New cladding to pipe work. |
Insulation and Cladding of boiler pipework. | |
Fyrewrap on a rooftop plantroom. | Pining away. |
Pining away. | Lagging and Cladding of boiler pipework. |
Chilled water and hot water lagging. Flow and return. | Fyrewrap before its put on. We always inspect the quality of the roll before installation. |
Reinstalling a duct after wrapping with duct lifters. | Now that's a wrap. Before being bolted and sealed to the wall slab. |
Cain blocking this duct down the riser. | I don't know how we got this through the door. |
Cladding | Boiler cladding |
Heating hotwater pipework | Repair to existing |
Basement area of a riser all done. Including Maxlite board on the penetration. | Sheet Metal tradesman |
Fyrewrap started on a fan. | Cladding |
Boiler cladding | One of our skilled Tradesmen at work! |
Cladding | Getting the duct ready to be reinstalled. |
Cladding | |
Fyrewrap being started on a fan. | |
Boiler Cladding | Smoke spill fan Fyrewraped. |
More basement Wrap | Heating hot water and chilled water lagging |
Plant room insualtion with victolic clamps ready for lagging. | Chiller pump valves ready for cladding. |
Chiller valves. | 11m up under slab |
sometimes it's not just wrap. Its art. | 11m up under slab. |
Ground floor transition. | Canteen area |
End of the run with Fire penetration and double layer done right. But it still looks great. | Canteen area |
sound lag | Office area sound lag. |
Ductwrap |
bottom of page